أهداف البرنامج

  • Understand optical fiber cable construction
  • Identify fiber types and connectors.
  • Apply fiber safety procedures.• Prepare optical cables for splicing.
  • Perform high-quality fusion splicing.• Install mechanical connectors and pigtails.
  • Organize fibers inside splice closures and ODFs.
  • Test splice quality using VFL, Optical Power Meter, and OTDR.
  • Troubleshoot common installation problems.

محاور البرنامج

  • Module 1 – Optical Fiber Fundamentals
  • Duration: 2 Hours
  • Theory
  • Introduction to optical fiber communication
  • Single-mode vs Multi-mode fibers
  • Fiber cable construction
  • Color coding standards
  • Cable types (Indoor, Outdoor, Drop Cable)
  • FTTH network overview
  • Practical
  • Identifying different cable types
  • Fiber identification exercises
  • Module 2 – Fiber Safety and Tools
  • Duration: 2 Hours
  • Theory
  • Laser safety
  • Handling bare fibers
  • Cleaning procedures
  • Introduction to common tools in fiber splicing and testing.
  • Module 3 – Cable Preparation
  • Duration: 4 Hours
  • Theory
  • Cable stripping procedures
  • Loose tube preparation
  • Buffer tube handling
  • Strength member preparation
  • Cleaning fibers
  • Cleaving principles
  • Practical
  • Each trainee prepares:
  • Indoor cable
  • Outdoor cable
  • Drop cable
  • Loose tube cable
  • Module 4 – Fusion Splicing
  • Duration: 6 Hours
  • Theory
  • Fusion splicing principle
  • Arc calibration
  • Core alignment
  • Typical splice losses
  • Common splice errors
  • Practical
  • Each trainee performas:
  • 20–30 fusion splices
  • Sleeve installation
  • Heat shrinking
  • Splice tray organization
  • Fiber routing
  • Acceptance criteria:
  • Splice loss <0.05 dB
  • Tensile check
  • Visual inspection
  • Module 5 – Fiber Termination
  • Duration: 4 Hours
  • Theory
  • Connector types (SC, LC, FC, ST)
  • UPC vs APC
  • Pigtails
  • Patch cords
  • Fast connectors
  • Mechanical splicing
  • Practical
  • Installation of:
  • SC/APC Fast Connector
  • SC/UPC Connector
  • Pigtail termination
  • ODF termination
  • Module 6 – Testing and Inspection
  • Duration: 4 Hours
  • Theory
  • Insertion loss
  • Return loss
  • OTDR basics
  • Event interpretation
  • Acceptance criteria
  • Practical
  • Testing using:
  • Light Source
  • OTDR
  • Trainee analyze:
  • Bad splice
  • Macro bend
  • Connector loss
  • Fiber break
  • Ghost events
  • Module 7 – Final Practical Assessment
  • Duration: 3 Hours
  • Each trainee completes a complete fiber link:
  • Prepare cable
  • Cleave fibers
  • Perform fusion splice
  • Install splice protector
  • Organize splice tray
  • Terminate pigtail
  • Install ODF
  • Test using Power Meter
  • Verify with OTDR
  • Produce a simple test report
  • Assessment
  • Theory Quiz: 20%
  • Laboratory Performance: 50%
  • Final Practical Exam: 30%
  • Target Audience
  • FTTH Installation Technicians
  • Optical Fiber Splicing Technicians
  • Telecom Field Engineers
  • OSP/ISP Installation Teams
  • Maintenance Engineers

الفئة المستهدفة

  • مهندسو وفنيو الاتصالات والشبكات الراغبون في التخصص العملي.
  • فنيو تركيب وصيانة ألياف الضوئية (FTTH / FTTX).
  • مقاوِلو البنية التحتية والشبكات ومشرِفو المشاريع الميدانية.